Kathmandu. The Department of Roads is preparing to open the damaged section of the Prithvi Highway in Krishnabhir, Dhading, for two-way traffic from October 1. However, geotechnical experts have warned that the temporary road being constructed by cutting the slope should not be considered a long-term solution. After the flood, the Trishuli River eroded the lower part of the road, and a temporary road is being constructed by cutting the upper slope to facilitate traffic in Krishnabhir. Although the Department of Roads has put forward this option to ease immediate traffic, geotechnical engineer Udayraj Neupane stated that construction should proceed...