Kathmandu. Major highway and road sections of Bagmati and Gandaki provinces have been affected by floods, landslides, and road maintenance. As of the report received at 06:00 AM on Monday, traffic is completely closed in some places due to potential floods and landslides, while in some places it has been brought to one-way operation. The Khurkot-Nepal Thok-Katuñjebesi section of the BP Highway in Kavre has been operating with a schedule for vehicles from Bhadra 16 until further notice. From 7:00 PM to 5:00 AM, cargo vehicles up to 10 tons will operate. From 4:00 AM to 6:00 PM, vehicles will...