Bagmati and Gandaki Highway Sections Affected by Floods, Landslides, and Road Maintenance

Kathmandu. Major highway and road sections of Bagmati and Gandaki provinces have been affected by floods, landslides, and road maintenance. As of the report received at 06:00 AM on Monday, traffic is completely closed in some places due to potential floods and landslides, while in some places it has been brought to one-way operation. The Khurkot-Nepal Thok-Katuñjebesi section of the BP Highway in Kavre has been operating with a schedule for vehicles from Bhadra 16 until further notice. From 7:00 PM to 5:00 AM, cargo vehicles up to 10 tons will operate. From 4:00 AM to 6:00 PM, vehicles will...