One-way traffic resumes at Daunne

NAWARPALASI, August 13: One-way traffic has resumed along the Daunne stretch of the Butwal-Narayanghat road section. Vehicular movement along the stretch had come to a halt for the last three days due to landslides.

सम्बन्धित सामग्री

One-way traffic resumes at Daunne after 17 hours

One-way traffic has resumed in the Nawalparasi section of the East-West highway, which was blocked since Sunday night after the road turned greasy following Sunday’s rainfall.